CBSA Opens Expedited Review for Chinese Truck Bodies
Hangzhou Zhongji requested an expedited SIMA review for truck bodies from China. Here's what changes for importers during the review period.
CBSA just opened an expedited review (TB 2026 XR) for truck bodies manufactured and exported by Hangzhou Zhongji Auto Co., Ltd from China. The company requested it themselves under SIMA subsection 13.2(3), which is the fast-track mechanism for an exporter to argue they’re no longer dumping or that their goods should be excluded from the existing SIMA measures.
This matters if you’re importing truck bodies from Hangzhou Zhongji right now, or planning to. Here’s what changes during the review window.
What SIMA 13.2(3) Expedited Reviews Do
A SIMA expedited review is narrower than a full expiry review. The exporter (in this case Hangzhou Zhongji) is asking CBSA to recalculate their normal value or rule that their specific products don’t meet the subject goods definition in the original CITT finding.
The original truck bodies finding covers goods classified under certain HS codes from China. If Hangzhou Zhongji can show their current pricing eliminates the dumping margin, or that their product spec has changed enough to fall outside the CITT’s subject goods description, CBSA can exclude them from SIMA duties going forward.
The review itself typically takes six to nine months. CBSA will request cost and pricing data from Hangzhou Zhongji, verify it, and either maintain the existing normal value or set a new one. If the exporter doesn’t cooperate or submit verifiable data, CBSA applies a ministerial-specified normal value (which is usually higher).
What Happens to Duties During the Review
This is the part that trips up importers: SIMA duties don’t pause during an expedited review.
If you file a CAD for Hangzhou Zhongji truck bodies tomorrow, you’re still paying anti-dumping duties at the current rate. The duty calculation uses the normal value CBSA has on file for this exporter before the review concludes. That amount gets assessed and collected through CARM, and it hits your Statement of Account the month after release.
If the review ends with a reduced or zero dumping margin for Hangzhou Zhongji, you can file a SIMA refund claim under section 59 of SIMA for any duties you paid during the review period on those shipments. The limitation period is four years from the date of final determination, but most brokers file within 90 days of the CBSA decision to avoid documentation churn.
If the review confirms or increases the margin, the duties you paid stand, and future shipments continue at that rate.
Should You Wait or File Now?
Don’t hold shipments waiting for this review to conclude. The timeline is unpredictable, and sitting on a shipment in a Montreal sufferance warehouse for six months just to avoid provisional SIMA duties is a losing play. Storage, dwell, and financing cost more than the refund process if the review goes in the exporter’s favour.
File the CAD now, pay the SIMA duty as assessed, and document the entry properly. If Hangzhou Zhongji prevails in the review, you’ll have clean records for a section 59 refund. If you try to defer and CBSA rules against them (or the review gets pulled for non-cooperation), you’ve burned half a year of working capital for nothing.
The exception: if you’re negotiating a contract with Hangzhou Zhongji and the SIMA duty is material to your landed cost model, write the refund possibility into your terms. Make it clear who files the section 59 claim and who keeps the refund if it comes through. Most supply agreements default to the importer of record holding the refund rights, but that’s worth confirming in writing before the first PO.
Who Tracks the Review Outcome
CBSA publishes expedited review determinations on its SIMA measures page. There’s no automatic notification to importers; you’re checking that page yourself or asking your customs broker to flag it when the determination posts.
The determination will state whether Hangzhou Zhongji’s normal value changed, whether their goods are excluded from the finding, or whether the existing measure stands. At that point, if you paid SIMA duties on Hangzhou Zhongji truck bodies during the review period and the determination reduces or eliminates the margin, your broker can prepare the section 59 refund submission.
If you’re importing truck bodies from other Chinese exporters, this expedited review doesn’t touch them. Each exporter has their own normal value under SIMA. Hangzhou Zhongji’s outcome has no bearing on your duties if you’re sourcing from a different manufacturer.
If you’re bringing in truck bodies from Hangzhou Zhongji and the SIMA duty line is large enough to matter, that’s exactly the kind of section 59 planning call we handle. Get in touch.
Source: CSCB
Related insights
- CITT Rules Injury on Truck Bodies from China—AD/CVD Collection Starts Now
- CBSA Terminates CVD, Confirms Dumping on Chinese Truck Bodies — What That Means for Your June 2026 CADs
- CBSA Extends UBC 2026 SIMA Investigation Timeline to 135 Days
- CITT Opens NQ‑2026‑001: Austrian OCTG Casing Dumping Inquiry and What It Means for Your CAD Filings
- CBSA Preliminary Dumping and Subsidy Findings on Forged Grinding Media from China — What Changes at the Border May 25